Services

Terra Firma (South) has undertaken many Projects across the UK encompassing all construction sectors, including Residential, Commercial, Industrial, Infrastructure, Energy and Renewable.

Our core activities include Site Investigation, Geotechnical Engineering, Earthworks, Preliminary Desk Study, Contaminated Land Risk Assessment and Environmental Assessment.

Please select a core activity below to outline our Specialisms within each.

Geo Technical Engineering

Geo Technical Engineering

Geotechnical site appraisals. Laboratory geotechnical soil and rock testing. Foundation and floor slab design including bearing capacity calculations. Settlement and consolidation calculations. Buried concrete design. Soakaway design. Ground stabilisation including...

Preliminary Desk Study

Preliminary Desk Study

Phase 1 Reporting. Historical Map, Aerial Photos and other documentary searches. Preliminary assessment of Contaminated Land. Geology, Hydrogeology and Hydrology. Radon Assessment. Mining Assessment. Development of Site Conceptual Models. Design of Phase 2 Site...

Site Investigation

Site Investigation

Design and Implementation of Exploratory, Main & Supplementary Site Investigations. Site Investigation techniques include: Trial Pitting, including hand-dug excavations. Windowless Sampling, Cable Percussive & Rotary Drilling. Geo-Tool/Geo-Probe Drilling for confined...

Earthworks

Earthworks

Design, implementation & supervision of earthworks. Design, implementation & supervision of ground improvements. In-situ DCP, CBR, density and plate load testing. For more information, feel free to contact us We're proud to provide competitive prices for a...

Contaminated Land Risk Assesment

Contaminated Land Risk Assesment

Phase 1 Preliminary Risk Assessment and site conceptual modelling. Phase 2 Quantitative Risk Assessment (Generic/Detailed) for human health and the water environment. Phase 3 Options Appraisal and Remediation Strategy design/development. Phase 4 Remediation Strategy...

Environmental Assesment

Environmental Assesment

Gas regime assessment including landfill/ground gas monitoring. Internal Radon Surveys (Rapid 7 Day & Standard 3 Month). Ecological considerations including tha assessment of Japanese Knotweed. Environmental Audits. Environmental Impact Assessment (EIA) contributions....